The Portland Foreside Development project will bring a mixed-use space to the Portland waterfront. This 10-acre site will contain office space with parking garage, housing, hotel lodging, restaurants, retail shops, a marina and plenty of outdoor space.
R.J. Grondin & Sons, Inc. is working with Consigli Construction on Phase 1 of the project by performing all the sitework and site improvements. The scope of work includes over 10,000 CY of on-site excavation that can’t leave the site because of environmental constraints, importing and placing of over 12,000 CY of gravels for parking lots and foundation backfill, connections to all the sewer, gas and water mains as well as all new storm drain infrastructure, site lighting installation, paving and brick paver installation.
Fill out this form and we’ll be in touch shortly.